Oracle Fusion Projects

Oracle Fusion Projects & Project Portfolio Management Cloud

Oracle Fusion Projects: Enterprise Project Portfolio Management in the Cloud

TL;DR

Oracle Fusion Projects (Oracle PPM Cloud) is Oracle's cloud-native platform for managing project delivery, resources, and financials in one controlled enterprise system.

  • ✓What Oracle Fusion Projects/PPM Cloud covers (projects, resources, costs, billing)
  • ✓Who it's for (PMOs, finance, and IT) and the typical problems it solves
  • ✓How it supports enterprise governance: standard processes, controls, and reporting
  • ✓What to look at during evaluation: data model, integrations, security, and adoption

Oracle Fusion Projects: Enterprise Project Portfolio Management in the Cloud

Oracle Fusion Projects—evaluated most often as part of Oracle Project Portfolio Management (PPM) Cloud—is Oracle's cloud-native platform for running projects at enterprise scale. The core idea is straightforward: bring project execution, resourcing, and financials into one application suite so delivery teams, PMOs, and finance aren't each working from their own version of the numbers.

That last part matters more than it sounds.

Most enterprise project environments accumulate a layer of spreadsheets, shadow trackers, and disconnected point tools sitting around the actual delivery work. When a finance director asks "what have we committed and what will it cost to finish?"—the answer requires reconciling three different sources. That's where things break down.

For PMOs, the appeal is standardisation. Consistent project setup, common work breakdown structures, governed change control, portfolio visibility across programmes—without chasing project managers for status updates in different formats.

Finance sees it differently.

The focus there is cost control and compliance: budgets, commitments, capitalisation rules, and an audit-ready record of where money went and why. We see this constantly during assessments—finance teams spending significant time manually reconciling project costs that should already be captured at source.

For IT, the priority is usually simpler: reduce integration sprawl and meet security requirements without building a custom middleware layer just to get project data into the general ledger.

At a practical level, Oracle Fusion Projects covers:

  • Project delivery: work breakdown structures, tasks, milestones, progress tracking, and status reporting
  • Resource and time: resourcing structures, time capture, and utilisation visibility—depending on which modules you configure
  • Costs and financial governance: cost collection, budgeting, forecasting, and controls aligned with finance expectations
  • Billing and revenue (where relevant): customer projects, internal projects, and mixed portfolios when configured appropriately

The tricky part is that PPM is positioned as part of an integrated cloud suite—not a standalone project management tool. That distinction matters when you need clean handoffs between project delivery, finance, procurement, and HR.

The integration points are exactly where disconnected tools and spreadsheet-based portfolios tend to collapse under their own weight.

So where should evaluation actually start? With the business outcomes you need. Faster project initiation. Better cost predictability. Stronger governance. More reliable portfolio reporting. Then validate whether Oracle Fusion Projects supports your specific project types—internal, capital, customer, agile, or hybrid delivery—along with your approval workflows and reporting model. Don't start with features.

For a broader view of Oracle's suite and where Projects fits, see Oracle Fusion.

What Is Oracle Fusion Project Portfolio Management Cloud?

Oracle Fusion Project Portfolio Management (PPM) Cloud—often searched as oracle fusion projects or project portfolio management cloud—is Oracle's end-to-end suite for planning, delivering, staffing, and financially controlling projects inside the Oracle Fusion Cloud platform. Built for organisations that need project execution tied directly to budgets, costs, revenue, billing, and compliance. Not just schedules and to-do lists.

The distinction matters.

Most standalone project tools are built around tasks, timelines, and collaboration. Oracle Fusion PPM Cloud is built to run projects as a business process. The same system that defines the work also captures labour and expenses, applies costing rules, supports contract and billing controls, and feeds financial statements—without heavy integrations or duplicate data entry.

It covers five core areas:

  • Project Management: Create and govern projects, define structures, manage tasks, milestones, deliverables, statuses, and progress reporting. It's designed to connect to cost and revenue flows—not sit in isolation.
  • Project Financial Management: Control budgets and forecasts, track actual costs (labour, expenses, procurement), apply cost rates, capitalise where required, and monitor margin. For many organisations, this is the reason to choose Oracle PPM over a standalone tool.
  • Project Billing: Support customer billing based on time and materials, milestones, percent complete, or other billing events—while keeping a clear, auditable trail between what was performed and what was invoiced.
  • Project Contracts: Manage customer project contracts and enforce the terms that drive funding, billing controls, and revenue recognition inputs.
  • Resource Management: Plan and assign people, manage demand against capacity, and get real visibility into utilisation. Because it connects to HR data, staffing decisions are based on actual worker records—not generic placeholders.

So where does Oracle Fusion PPM Cloud actually pull ahead?

Native integration with the rest of Oracle Fusion Cloud is a big part of it. No bolted-on connectors. No reconciliation work between systems.

  • Oracle Fusion ERP: General ledger impact, cost accounting, budgeting, invoicing, and financial reporting all align with the project structure. No manual reconciliation.
  • Oracle Fusion HCM: Worker records, organisational structures, time entry, and approvals connect directly to project staffing and labour cost tracking.
  • Oracle Fusion Procurement: Purchases and supplier invoices are attributed to specific projects and tasks, so you can see committed versus actual costs at the project level without chasing data across systems.

That single-platform approach is the real point of difference. Oracle Fusion PPM Cloud isn't just where teams plan work—it's where the organisation governs delivery and financial outcomes in the same data model.

Project template
A project template is a predefined configuration for creating new projects with consistent structures, options, and controls.
Work breakdown structure (WBS)
A work breakdown structure is the hierarchy that organises a project into phases and tasks so work, costs, and progress can be tracked consistently.
Task assignment
A task assignment links a person or role to a project task so responsibility, effort, and related costing or time capture can be managed.

Key Takeaways

  • ✓Oracle Fusion PPM Cloud is a full project execution and financial control suite, not just a task and schedule tool.
  • ✓Its core areas cover project management, financial management, billing, contracts, and resource management in one platform.
  • ✓Native integration with Oracle Fusion ERP, HCM, and Procurement reduces duplicate data, simplifies governance, and strengthens project financial visibility.

Project Financial Management: Budgets, Costs and Revenue

Oracle Fusion Projects Project Financial Management is where budgets, actual costs, billing and revenue come together so project managers and finance teams can maintain real financial control. That means setting up budget baselines, pulling costs from multiple sources, recognising revenue in a way that matches the contract type, and forecasting outcomes before month-end closes on you.

Control before spending

Strong project financial control starts with a baselined budget and clear approval rules. When budgets are tied to cost accounts, tasks and funding sources, you can validate charges early and avoid rework at period close.

Budget creation, baselines and control

Budgeting starts with a planned cost breakdown by project and task—usually aligned to the WBS. Then it extends into control features that protect you once execution is underway.

  • Budget versions and baselines: Create working versions, route for approval, then baseline to lock the approved plan for variance reporting.
  • Budgetary control (where enabled): Enforce spending controls at the right level—by task and expenditure type, for example. This supports hard stops or advisory warnings when costs exceed available funds.
  • Funding and burdening considerations: For funded work, budgets can be tracked by funding source. Burden schedules calculate overheads and apply them consistently to raw costs for full cost visibility.
  • Change control: Use additional budget versions or adjustments to reflect approved scope changes and maintain a clean audit trail of what changed and why.

Cost collection: labour, expenses and supplier invoices

Project costs in Oracle Fusion Projects arrive as raw costs from multiple feeder processes, then become accounted costs after validation, costing and accounting.

The tricky part is that each source has its own validation rules and failure points.

Labour time—entered directly or imported—gets charged to project and task, validated against project status, dates and chargeability rules, then costed using defined rate schedules. Employee expenses follow a similar path: policy controls apply upstream, project validation downstream. Supplier invoices and procurement charges come in through invoice distributions coded to projects, or derived from purchasing, carrying the right expenditure types and organisations with them.

After import, costs move through validation, cost distribution and burdening where applicable. This is where most practical issues surface—incorrect dates, closed tasks, invalid expenditure types, missing transaction attributes. Find them here, not in finance.

Revenue recognition: choosing the right method

Revenue depends on how the work is contracted and what your accounting policy requires. We see this vary significantly across implementations, and getting it wrong creates reconciliation headaches that compound over time.

Typical approaches include:

  • As-incurred / cost-based revenue: Revenue calculated from eligible costs, often with markups or rate schedules applied.
  • Percent complete / performance-based: Revenue follows progress—physical percent complete or earned value—not just cost accumulation.
  • Milestone or event-driven: Revenue triggered when defined events are achieved and approved.
  • Time and materials billing with revenue: Billing based on actuals, while revenue follows the contract's accounting rules.

Align project setup—contract type, billing and revenue plans, rate schedules, event definitions—with finance policy from the start. If that alignment isn't there, revenue becomes unpredictable and hard to reconcile at period end.

Forecasting: staying ahead of overruns and margin erosion

Forecasting combines approved budgets, actual costs, commitments like open POs, and estimates-to-complete to predict final cost and—where applicable—final revenue and margin.

A practical forecasting rhythm usually means updating ETC at task level for work packages trending off-plan. Reviewing commitment coverage. Separating forecast changes driven by scope from those driven by performance—inefficiency, rework, things that shouldn't be hidden inside a budget adjustment. And comparing forecasts to the current baseline, not the original budget, to keep governance meaningful.

Important

If transaction validation and project/task status rules aren't tight, costs can land in the wrong period or wrong task, then require reversals and reprocessing. Fixing this at month-end is slow and can distort revenue and margin reporting.

How project costs flow into Oracle General Ledger

Project accounting and financial accounting stay in sync through controlled accounting events. That's one of the core strengths of Oracle Fusion Projects—when it's set up correctly.

At a high level:

  1. Cost is captured—time, expense or invoice—with project, task, expenditure type and organisation attributes attached.
  2. Cost is validated and costed in Projects, producing accounted amounts.
  3. Accounting is created via Subledger Accounting rules, generating the correct debits and credits for each transaction.
  4. Subledger entries are transferred and posted to Oracle General Ledger, landing in the right natural accounts and cost centres based on account derivation rules.

For capital projects, this typically supports construction-in-progress (CIP) accounting during execution. When the asset is placed in service, balances move to fixed assets—depending on your setup and process design.

Capital project lifecycle

A facilities team runs a building refurbishment project. Finance baselines a task-level budget and enables budgetary control for key spend categories. Labour time and travel expenses are charged weekly; supplier invoices for contractors are coded to the project and validated. Costs post to CIP accounts in the General Ledger via SLA. As milestones are completed, the team updates ETC forecasts and reviews budget vs actuals. When the refurbishment is placed in service, eligible CIP costs are capitalised (transferred out of CIP) and the asset record is created/updated so depreciation can start.

Resource Management and Project Scheduling in Oracle Fusion

Resource management is where most organisations see the biggest operational return from oracle fusion projects within project portfolio management cloud. Not just visibility into who is on what. Whether you can actually staff upcoming work without burning out the people who carry everything.

Resource pools and ownership (who can be assigned, and by whom)

Oracle Fusion lets you organise people into resource pools—typically aligned to departments, delivery teams, locations, or job families. Done well, this gives you real control over who works on what, and who decides.

  • Standardise eligibility for certain work types (for example, "Data Engineering – EMEA")
  • Define who approves or places assignments—resource managers, not whoever happens to have system access
  • Separate demand planning from named assignments, which matters when you don't yet know the exact person

The tricky part is getting clarity upfront on whether projects should request roles (e.g., "Senior Consultant") or named people—and what approval steps apply in each case.

Without that decision, governance breaks down fast.

Capacity planning (turning demand into an achievable plan)

Capacity planning exists to stop teams committing to delivery dates they can't meet.

In Oracle Fusion, you compare project demand—planned hours and effort against project roles and tasks—with resource supply, based on calendars, employment dates, and working hours. Straightforward in theory. Messier in practice.

We see this constantly during technical audits: the data exists, but no one has agreed on the planning unit (hours vs. FTE), the horizon (near-term vs. quarterly pipeline), or how to handle non-project time like BAU, presales, and PTO. Without those decisions locked in, the capacity picture is unreliable before you've even started.

Skill-based assignment (staffing by capability, not guesswork)

"Who is free?" is the wrong question. The right one is "who is qualified and available?"

Skill-based matching in Oracle Fusion can get you there—if the underlying data is clean. With a consistent skills and proficiency model, teams can:

  • Search by skill, location, and availability
  • Prioritise best-fit candidates for critical tasks
  • Reduce the delivery risk that comes from misaligned staffing

Most SaaS teams miss this: it only works if skill names, proficiency levels, and ownership are standardised and maintained. If they're not, searches return noise. People revert to Slack and gut instinct.

Utilisation tracking (what's planned vs. what happened)

Planned utilisation comes from resource assignments and schedules. Actual utilisation comes from time entry and project progress.

The gap between them is where problems hide.

Used properly, utilisation reporting surfaces chronic overallocation—a burnout risk disguised as a resourcing plan—as well as underutilised teams you could redeploy, and skill bottlenecks where demand consistently outpaces supply.

Project scheduling: dependencies, Gantt-style planning, and progress tracking

Scheduling is where the resource plan meets actual delivery logic. Oracle Fusion supports structured task planning across four key areas:

  • Task hierarchies – work breakdown structures for planning and reporting
  • Task dependencies – predecessors and successors that enforce sequence and surface knock-on effects when something slips
  • Gantt-style planning – visual timing, overlaps, and critical path visibility
  • Progress tracking – task status and completion updates that show schedule health in real time

This is what connects "we have a plan" with "we are executing it." And it's what lets PMOs spot delays before they hit milestones, while there's still time to react.

Resource request and assignment workflow in Oracle Fusion Projects

  1. Step 1

    Project manager creates demand

    Define project roles and required effort by time period (and optionally by skill, location, and rate constraints) so demand is visible for capacity planning.

  2. Step 2

    Resource manager reviews capacity and fit

    Check pool availability, conflicts, and skill match; identify gaps early and propose alternatives (different profile, timing, or sourcing approach).

  3. Step 3

    Shortlist and validate candidates

    Evaluate named resources against skills and schedule constraints; confirm practical considerations like time zones, onboarding lead time, and partial allocations.

  4. Step 4

    Assign resources and baseline the plan

    Convert demand into assignments; align allocations to the project schedule and baseline if your governance requires it for change control.

  5. Step 5

    Track utilisation and adjust

    Monitor planned vs. actual, manage changes through approvals where needed, and update assignments when priorities or delivery dates shift.

At AppsolveGroup, the most common resource management problems we see in Oracle Fusion come from inconsistent calendars and missing governance—teams plan in hours but capacity is maintained in a different unit, or anyone can assign resources without approvals, which leads to unreliable utilisation and forecast reporting.
Should we plan resourcing in roles or named people in Oracle Fusion Projects?

Start with roles for early demand and pipeline planning, then convert to named resources when delivery is committed. This keeps forecasting realistic while still enabling accurate utilisation once staffing decisions are final.

What data needs to be accurate for capacity planning to work?

Resource calendars/working hours, employment start/end dates, time-off where applicable, and a consistent approach to how non-project work is represented. Without these, capacity will look better (or worse) than it really is.

How do task dependencies help with scheduling and resourcing?

Dependencies enforce sequencing, so when one task slips you can see which downstream tasks and milestones are impacted. That visibility helps you decide whether to change staffing, re-sequence work, or adjust dates.

Why is skill-based assignment often unreliable after go-live?

Because skills aren't governed. If skill names, proficiency levels, and ownership aren't standardised, searches return poor results and teams revert to manual staffing.

Project Billing, Contracts and Customer Invoicing

In oracle fusion projects within project portfolio management cloud, billing and contracts are where project execution becomes cash flow. The core capability covers how you sell (contract terms), how you bill (events, rate-based, milestones), how you invoice (draft invoices, approvals, accounting), and how you recognise revenue—aligned to performance obligations and satisfaction patterns.

Oracle Fusion Projects Billing and Contracts: what each does

Two distinct modules. Different jobs.

Oracle Fusion Contracts is where you structure the commercial agreement: customer, contract lines, billing terms, funding where eligible, and the rules that drive billing and revenue. Oracle Fusion Project Billing is where project actuals and billing events become invoice lines and accounting. Rate-based billing for time and materials, event-based billing for milestones, and combinations for hybrid delivery models.

Common contract types you'll configure:

  • Fixed price: Often milestone or percent-complete billing with defined amounts. Billing typically depends on billing events or contract billing milestones rather than raw costs or hours.
  • Time and materials (T&M): Rate-based billing driven by labour and non-labour transactions, with bill rates, markups, caps, and billing controls.
  • Milestone-based: Event-driven billing tied to deliverable acceptance, dates, or contractual milestones—useful for both fixed price and phased delivery.

Billing events and controls (to prevent surprises later)

A billing event is the operational trigger that turns "work done" into "amount billable." In Oracle Fusion, you'll manage events including milestone achievement, manual adjustments, hold and release actions, and fee-based events depending on your setup.

We see this constantly during implementations.

Teams configure events correctly but leave holds in place with no release workflow. That hold becomes an invisible blocker. Invoicing stalls, with no obvious cause in sight.

Key practices when implementing billing event management:

  • Define who can create and approve events, and at what thresholds.
  • Standardise event naming and required fields—milestone ID, acceptance date, period, revenue treatment.
  • Use holds intentionally for things like disputed scope, and build a clear release process. No release workflow means no invoice.

Invoice generation: from draft to accounted invoice

Invoice generation typically follows this sequence:

  1. Project transactions are captured (time, expenses, supplier costs) and validated.
  2. Billing events and rate-based rules determine what's billable.
  3. Draft invoices are generated, reviewed, and approved.
  4. Invoices are transferred to Receivables and accounted, depending on your orchestration and accounting setup.

The tricky part is usually not the system. It's operational timing. Calendar cutoffs, timesheet approval deadlines, expense audit cycles, and customer submission requirements—POs, deliverable sign-offs, backup documentation—all have to align with how the billing process is configured. Mismatches here are the most common reason invoice cycle times stretch out.

56%

Organizations that automate invoicing report faster invoice cycle times compared with manual billing workflows.

Source: Gartner

Revenue recognition alignment: IFRS 15 and ASC 606

Oracle Contracts and Project Billing are commonly configured to support revenue recognition under IFRS 15 and ASC 606. The goal isn't tick-the-box compliance. It's consistent, auditable treatment of performance obligations, transaction price allocation, and recognition timing.

How this maps in practice:

  • Performance obligations and contract lines: Contract structure needs to reflect what you actually deliver and how customers accept it. Over-simplified lines create revenue timing issues that surface at period close.
  • Satisfaction pattern: Revenue may be recognised over time (based on progress) or at a point in time (upon acceptance). Your billing plan can be milestone-based while revenue is recognised over time—these don't have to match, but they must reconcile cleanly.
  • Variable consideration and constraints: Change orders, holdbacks, bonuses, penalties, and usage-based fees all need clear rules. Without them, revenue gets overstated.
  • Contract modifications: Decide upfront whether changes are treated as separate contracts or modifications to existing obligations. A common mistake we see is teams processing amendments without realigning the billing schedule or revenue rules—which breaks both.

The most reliable implementations build a defined contract governance process across commercial, delivery, and finance teams.

What's in the contract needs to reflect the revenue policy and the billing mechanics. When those three aren't aligned, everything downstream is harder than it needs to be.

Contract setup readiness checklist

Use this before go-live—or before enabling any new contract template—to avoid billing stalls and revenue misstatements.

Contract setup readiness checklist

  • ✓Confirm contract type and billing method (fixed price, T&M, milestone, or hybrid)
  • ✓Validate customer, bill-to, ship-to, and tax configuration needed for invoicing
  • ✓Define contract lines that match performance obligations and internal revenue policy
  • ✓Set billing plans/schedules and event requirements (milestones, acceptance dates, approvals)
  • ✓Configure rate schedules, bill rates, markups, caps, and non-billable rules for T&M
  • ✓Map project/task structure to contract lines (and confirm chargeable task rules)
  • ✓Set up billing controls: holds, limits, funding (if applicable), and approval workflow
  • ✓Test end-to-end: create transactions → generate draft invoice → transfer to receivables → accounting → revenue recognition outputs
  • ✓Confirm cutoffs and operational cadence (time entry, expenses, event approvals, period close)

Common configuration errors

Frequent causes of billing delays include mismatched project/task to contract line mapping, missing bill rates or incorrect rate schedules, milestone events created without required acceptance dates/approvals, holds left in place with no release workflow, and contract amendments that don't realign billing plans and revenue rules.

Implementing Oracle Fusion PPM Cloud with AppsolveGroup

Implementing oracle fusion projects and project portfolio management cloud works best when you treat it as a business change programme—not a system setup. That distinction matters more than most teams expect.

At AppsolveGroup, we run Oracle Fusion PPM Cloud implementations with a structured, test-led approach. Finance, PMO, and delivery teams stay aligned from day one. No handoffs that create gaps. No surprises at UAT.

We start by understanding how your organisation currently initiates, approves, plans, and governs projects—and where that process breaks down. From there, we design a target-state model that fits Oracle Fusion PPM Cloud capabilities, your reporting requirements, and your controls.

Without over-customising.

We've seen what over-configuration does to upgrade cycles and ongoing maintenance costs. It's a pattern that shows up repeatedly during implementation audits, and we avoid it deliberately.

As an Oracle partner, we follow Oracle-aligned implementation practices with a focus on predictable delivery, clear ownership, and clean data from the start. Learn more about our Oracle capability at Oracle Fusion and how we work at Why AppsolveGroup.

Our Oracle Fusion PPM Cloud implementation approach

1
Requirements discovery

Confirm project types, governance, financial controls, integrations, reporting, security roles, and success criteria with PMO, Finance, and delivery stakeholders.

2
Solution design

Map your operating model to Oracle Fusion Projects and PPM processes, define key configurations, approvals, reference data, and integration approach.

3
Configuration and build

Configure PPM Cloud modules, security, workflows, and reports; set up environments and establish configuration governance and change control.

4
Data migration and validation

Prepare and cleanse legacy project, resource, and financial data; run trial loads, reconcile outputs, and validate reporting and downstream impacts.

5
UAT, go-live, and hypercare

Run scenario-based UAT, fix defects fast, complete cutover planning, then provide hypercare support to stabilise operations and close gaps.

Change management runs alongside the technical work the entire time. Not bolted on at the end.

Oracle Fusion PPM changes day-to-day behaviour in ways teams don't always anticipate. Who raises project requests. How approvals route. What "done" actually means in project financials, and how exceptions get handled. We build a practical change plan covering:

  • Stakeholder alignment and communications
  • Role-based training built around actual workflows
  • Adoption checkpoints that catch friction before it becomes a problem

The goal is that new processes stick after go-live—not just during it.

Most PPM Cloud issues we see after go-live aren't configuration problems—they're unclear ownership of project data and inconsistent governance. Getting decision rights and data standards agreed early prevents rework and improves reporting trust.

Training is built around real roles and real scenarios. Not generic screen walkthroughs.

Project managers learn how to create and maintain project structures in the way your organisation actually works. Finance teams get hands-on practice with period close impacts and financial controls. PMO leaders learn to run portfolio reviews with consistent status reporting and KPIs they can trust.

Post go-live, hypercare covers both system questions and process friction. That second category is the one most implementations underestimate. Fast triage, clear resolution, and a team that already knows your configuration—that's how you stabilise quickly and keep momentum going.

Book a PPM discovery workshop

Get a structured requirements review, scope definition, and implementation plan for Oracle Fusion PPM Cloud with clear risks and next steps.

Ready to Modernise Your Project Management with Oracle Fusion PPM?

Complex delivery across multiple teams, entities, or geographies puts real pressure on your tooling. And "good enough" stops being good enough faster than most people expect.

Oracle Fusion Projects—and the broader project portfolio management cloud suite—is built for organisations that need consistent governance, real-time visibility, and tighter cost and resource control. Not another patchwork of disconnected systems held together with spreadsheets and manual updates.

That distinction matters more than it sounds.

At AppsolveGroup, we work with marketing, operations, and finance stakeholders who are tired of chasing accurate data. Clear portfolio status. Trusted financials. A single view of delivery performance. That's what we help teams actually get to.

Whether you're already on Oracle Cloud and want to standardise project controls, or you're replacing a legacy system that's outlived its usefulness, we map Oracle Fusion PPM capabilities to your specific processes and priorities—not a generic blueprint.

A good starting point is a free PPM assessment.

We'll look at your current setup—tools, reporting, data flows, the pain points your team keeps running into—and give you a practical action plan:

  • What to configure
  • What to integrate
  • What to fix first

So your rollout delivers something measurable, not just a go-live.

Explore Oracle Fusion PPM with AppsolveGroup

When you're ready, speak to our team about your Oracle Fusion Projects roadmap and how to get the most from your project portfolio management cloud investment.

Free Oracle Fusion PPM assessment

Review your current project controls, reporting, and data flows, then get a clear action plan for Oracle Fusion PPM.

Ready to modernise project delivery?

Talk to us about Oracle Fusion Projects and PPM Cloud implementation and support.

Talk to a specialist

Get in touch about Oracle Fusion Projects

Ian and Gavin and the wider APPSolve Group team can talk through your situation — no obligation, no generic sales pitch. Just a direct conversation about what a realistic path forward looks like.